Sunshine Portal · Section
PO 0000442216
Department of Transportation
PO Details
- PO ID
- 0000442216
- PO Date
- 09-01-2026
- Agency
- Department of Transportation
- Vendor
- CUTLER REPAVING INC
- Contract ID
- 30805002317018
- Division
- 20100
- Vendor ID
- 0000013596
- PO Status
- Dispatched
- Buyer
- 365530.HOL
- Origin
- CON
- Cancel Status
- X
- PO Amount
- $92,134.00
Division, PO Status, Origin, and Cancel Status are derived from positional fields in the SHARE PO_EXTRACT file. PO Status (D → Dispatched,C → Cancelled) and Cancel Status (A → Approved, C → Cancelled) translations are inferred from the live Sunshine Portal screens and remain pending DOIT confirmation.
Line Items
9 line items on this purchase order.
| Line Item | Category | Description | Date | Total Amount | Amount Expended | Balance |
|---|---|---|---|---|---|---|
| 1 | Other Services | 003 - 70,001+ PAVEMENT RESURFACING TO INCLUDE HEATING, SCARIFICATION (1 INCH TO 1-1/2 INCH) RECYCLING OF EXISTING PAVEMENT AND MIXING WITH NEW HOT MIX MATERIAL SPREADING AND COMPACTION26,324 SY @ $3.50 = $92,134.00 | 09-01-2026 | $92,134.00 | $0.00 | $92,134.00 |
| 2 | Other Services | 006 - 70,001+ PAVEMENT RESURFACING TO INCLUDE HEATING, SCARIFICATION (1 INCH TO 1-1/2 INCH), RECYCLING OF EXISTING PAVEMENT AND MIXING WITH NEW HOT MIX MATERIAL, SPREADING AND COMPACTION IN AREAS WITH CURB AND GUTTER72,965 SY @ $3.96 = $288,941.40 | 09-01-2026 | $288,941.40 | $0.00 | $288,941.40 |
| 3 | Other Services | 011 - CURB LINE COLD MILLING OF ASPHALT SURFACE 50,001+ S.Y.-INCH177,749.60 SY INCH @ $1.86 = $330,614.26 | 09-01-2026 | $330,614.26 | $0.00 | $330,614.26 |
| 4 | Other Services | 013 - RE-ESTABLISH TEMPORARY CENTERLINE WITH 4 INCH BY 4 FOOT STRIPE WITH 36 FEET SPACING AS DESIGNATED BY THE DISTRICT ENGINEER OR THEIR DESIGNEE1,241.00 LF @ $1.35 = $1,675.35 | 09-01-2026 | $1,675.35 | $0.00 | $1,675.35 |
| 5 | Other Services | 014 - RE-ESTABLISH TEMPORARY CENTERLINE WITH REFLECTORIZED TABS AT 40 FEET SPACING OR AS DESIGNATED BY THE DISTRICT ENGINEER OR THEIR DESIGNEE702 @ $1.20 = $842.40 | 09-01-2026 | $842.40 | $0.00 | $842.40 |
| 6 | Other Services | 017 - TRAFFIC CONTROL URBAN TO INCLUDE ALL SIGNING AND TRAFFIC CHANNELIZATION DEVICES FOR ADEQUATE HANDLING OF TRAFFIC. URBAN TRAFFIC CONTROL TO BE DEFINED AS REQUIRING SIGN SPACING TO BE 350' OR LESS199 HR @ $300.00 = $59,700.00 | 09-01-2026 | $59,700.00 | $0.00 | $59,700.00 |
| 7 | Other Services | 019 - FLAGGING FOR URBAN AND RURAL TRAFFIC CONTROL. PAYMENTS SHALL BE PER FLAGGER PER HOUR351 HR @ $45.00 = $15,795.00 | 09-01-2026 | $15,795.00 | $0.00 | $15,795.00 |
| 8 | Other Services | 020 - SEQUENTIAL FLASHING ARROWS / FLASHING DIRECTIONAL ARROWS AS REQUIRED BY THE DISTRICT ENGINEER OR THEIR DESIGNEE313.50 HR @ $30.00 = $9,405.00 | 09-01-2026 | $9,405.00 | $0.00 | $9,405.00 |
| 9 | Other Services | 035 - PG 70-22 ASPHALT BINDER FOR ALL DISTRICT ONE PLANTS491 TON @ $1,059.00 = $519,969.00 | 09-01-2026 | $519,969.00 | $0.00 | $519,969.00 |
Showing 1 to 9 of 9 entries
← PrevPage 1 / 1Next →