TRANE US INC
Purchase orders that Agency has placed with TRANE US INC for FY2027. Click a PO to see line items and detail.
Data as of: October 31, 2026Updated: November 17, 202618 records
- # of Purchase Orders
- 18
- Total Amount
- $229,928.02
- Balance
- $200,083.55
Purchase Orders
18 POs with TRANE US INC at Agency. Click a PO ID to see its line items.
FY2027 · Executive
Filters
| PO ID | Description | Contract ID | PO Date | Total Amount | Amount Expended | Balance |
|---|---|---|---|---|---|---|
| — | — | — | — | $229,928.02 | $29,844.47 | $200,083.55 |
| 0000213376 | HVAC preventative maintenance. Labor hours for 333.36 hrs @ 170.39 under SIN 811-002/811-005 for Fort Bayard Medical Center. Services from 7/1/26-6/30/27. | 00000002000099 | 07-08-2026 | $72,665.24 | $18,288.76 | $54,376.48 |
| 0000213075 | HVAC & systems inspection & maintenance $9,560.07 labor + $39,203.63 =FY27 Total $48,763.70 | 00000002000099 | 07-01-2026 | $52,006.15 | $0.00 | $52,006.15 |
| 0000213848 | ANNUAL INSPECTION OF HEATING AND COOLING EQUIPMENT FOR MEADOWS, DIETARY, ISLETA & TESUQUE AT NEW MEXICO BEHAVIORAL HEALTH INSTITUTE FY27JOURNEYMAN/ FOREMAN/ EXPERIENCED TECHNICIAN WORKER | 30000002300084AV | 07-20-2026 | $47,951.05 | $0.00 | $47,951.05 |
| 0000215701 | AHU Static Pressure & Actuator Replacement needed for NMRCProposal ID: 8919497Materials Cost: $5,692.19HVAC BAS A/C Tech QTY 24 @ $228.00 = $5,472.00Subtotal: $11,164.19Tax @ 8.6875% = $959.89Total: $12,134.08 | 30000002300084AV | 10-16-2026 | $12,134.08 | $0.00 | $12,134.08 |
| 0000215892 | Diagnostic Check on Chiller needed for NMRCProposal ID: Emergency PO2 Technicians @ $170.39 for 20 hours = $3,407.8OT @ $255.59 for 8.5 hours = $2,172.52Sub-total- $5,580.32Tax @ 8.2708% = $461.54Total = $6,041.86 | 30000002300084AV | 10-27-2026 | $6,041.86 | $0.00 | $6,041.86 |
| 0000213668 | Replace fuses on accurex dish exhaust fan D2. Item #slhff204ah | 00000002000099 | 07-14-2026 | $5,397.33 | $5,397.33 | $0.00 |
| 0000214629 | HVAC tech labor to troubleshoot walk in cooler and freezer. | 00000002000099 | 08-18-2026 | $4,908.77 | $0.00 | $4,908.77 |
| 0000214364 | Repair of Freedom Resident Room Ceiling Leak by furnishing the necessary labor to wrap duct work and refrigerant lines with insulation not to exceed 15 feet of ductwork.Cost of Labor - 1 @ $4200.00Tax on Labor - 1 @ $351.75Total Cost - 1 @ $4551.75 | 00000002000099 | 08-11-2026 | $4,551.75 | $0.00 | $4,551.75 |
| 0000215142 | Pool Unit Gas Valve ReplacementPool Unit - Model # MPE-1-W3-42-060-a2M / Serial # 21443640Furnish the Necessary Labor to Replace one (1) Gas Valve on Above Mentioned Unit Total Cost - $3958.11Tax - $331.49Total - $4289.60 | 00000002000099 | 09-11-2026 | $4,289.60 | $0.00 | $4,289.60 |
| 0000215104 | Adjusting Building Pressurization- Technician @ $170.39 for 8 hours = $1,363.12 OT @ $255.59 for 8 hours = $2,044.72Estimated Parts Cost = $92.77Sub-total- $3,500.61Tax @ 8.2708% = $289.53Total cost with estimated taxes = $3790.14 | 30000002300084AV | 09-10-2026 | $3,790.14 | $0.00 | $3,790.14 |
| 0000214845 | HVAC repair- Apprentice/experienced worker @ $221 for 14 hours= $3094.00Estimated Travel Cost- $250.00Tax @ 8.2708% = $255.90Total cost with estimated taxes= $3599.90 | 30000002300084AV | 08-26-2026 | $3,349.90 | $3,349.90 | $0.00 |
| 0000214262 | REFRIGERATED AIR MOTOR5HP, 1800RPMITEM #EHM3218TQTY 3 @$876.16 =$2,628.48 | 00000002000099 | 08-06-2026 | $2,808.48 | $2,808.48 | $0.00 |
| 0000215281 | Dryer Insulation on Dryer Pool UnitLabor - 8 Hours @ $232.00/HR = $1856.00Materials Insulation - $300.00Tax on Labor - $155.44Total Cost - $2311.44 | 00000002000099 | 09-21-2026 | $2,311.44 | $0.00 | $2,311.44 |
| 0000215865 | Furnish the necessary parts & labor to provide jetting of Sewer Mainline. Work to be done on Double time Emergency. Net Cost $2055.44Total Tax $172.14Total Cost $2227.58 | 00000002000099 | 10-26-2026 | $2,227.58 | $0.00 | $2,227.58 |
| 0000215880 | Furnish the necessary parts & labor to provide jetting of Sewer Mainline of Brigade and B-Unit. Work to be done on Double time Emergency. Net Cost $2055.44Total Tax $172.14Total Cost $2227.58 | 00000002000099 | 10-26-2026 | $2,227.58 | $0.00 | $2,227.58 |
| 0000213949 | Check Humidification System at the Annex Building located at 992B S. Broadway, T or C, NM, 87901.HVAC Tech Labor - 1 @ $1768.00Tax on Labor - 1 @ $148.07Total Cost - $1916.07 | 00000002000099 | 07-23-2026 | $1,916.07 | $0.00 | $1,916.07 |
| 0000213692 | HVAC COMMERCIAL A/C TECH II 8hrs @ $221.00..... $1,768.00 USDTRAVEL: $ 766.40 USDTOTAL PRICE: $2,534.40 USD | 30000002300084AV | 07-15-2026 | $1,350.00 | $0.00 | $1,350.00 |
| 0000215227 | AHU-4 Valve Replacement needed for NMRC HVAC RepairsMaterials cost: $13,547.05HVAC Commercial A/C Tech II: QTY 12 @ $221 = $2,652.00Subtotal: $16,199.05 Tax 8.6875% = $1,407.29Bond @ 1.5% = $264.10 Total = $17,870.44 | 30000002300084AV | 09-17-2026 | $1.00 | $0.00 | $1.00 |
Showing 1 to 18 of 18 entries